VAAR 852.236-79 — Contractor Production Report

VAAR — Veterans Affairs · Contract clause · dated APR 2019 · prescribed in 836.573

Official text of 852.236-79

As prescribed in 836.573, insert the following clause:

Contractor Production Report (APR 2019)

(a) The Contractor shall furnish to the resident engineer, for each workday, a consolidated report for the preceding workday. Reporting shall begin from date of mobilization until the date of final acceptance except for authorized holidays. VA Form 10101, Contractor Production Report, or a Contractor generated form containing the same type of information shall be signed, dated and submitted by the Contractor superintendent.

(b) Each report shall include and specifically identify at least one safety topic germane to the jobsite that day.

(End of clause)

Where it's prescribed

As prescribed in 836.573, insert the following clause:

Verifying this text

The text above is reproduced verbatim from GSA's published source files for the Veterans Affairs supplement. The controlling version is the one in the Code of Federal Regulations: 852.236-79 on eCFR.