In plain English
FAR 52.236-10, Operations and Storage Areas, is a contract clause prescribed at FAR 36.510, most recently dated Apr 1984. The complete official text is reproduced below, verbatim, from GSA's published FAR source files.
Its text contains no sentence requiring insertion into subcontracts; see the flowdown section below for what that does and does not mean.
Does it flow down to subcontracts?
No flowdown mandate found in the clause text
We scanned the full clause text and found no sentence directing the contractor to insert this clause into subcontracts. That is a statement about the text, not legal advice: a prime contractor may still flow terms down contractually, an agency supplement (DFARS, VAAR, …) may add requirements, and clauses listed below (if any) may order this clause into subcontracts from the outside.
Where it's prescribed
As prescribed in 36.510 , insert the following clause:
Prescribing reference: FAR 36.510.
The official text, verbatim
As prescribed in 36.510 , insert the following clause:
Operations and Storage Areas (Apr 1984)
-
(a) The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer. The Contractor shall hold and save the Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor’s performance.
-
(b) Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the Contractor only with the approval of the Contracting Officer and shall be built with labor and materials furnished by the Contractor without expense to the Government. The temporary buildings and utilities shall remain the property of the Contractor and shall be removed by the Contractor at its expense upon completion of the work. With the written consent of the Contracting Officer, the buildings and utilities may be abandoned and need not be removed.
-
(c) The Contractor shall, under regulations prescribed by the Contracting Officer, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the Contracting Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the Contractor shall protect them from damage. The Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.
(End of clause)